Past Project: Exhaust Gas Boiler Re-tubing
SCOPE: Prefabricate gas bypass, blank off economizer and fit exhaust gas with the vessel in port. Removal of the existing wasted tubes, rigging, fitting and weld in place of new tube blanks with riding crew whilst vessel is underway.
Duration: 2 weeks:
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 |