Engine Entablature Rigging

Past Project – Engine Entablature Rigging

Scope: Rigging of a 13 ton engine block from the Stb’d side of the Diesel Generator room to the Port side access and off the vessel. On vessel’s return rig new entablature back across the Diesel Generator flat into position

Duration: 1 day each call

Get in TouchSchedule Free Appointment






    Submit

    Need Repairs or Have Questions?

    We’re Ready to Help — 24/7 Support Available.