Past Project - Engine Entablature Rigging
Scope: Rigging of a 13 ton engine block from the Stb’d side of the Diesel Generator room to the Port side access and off the vessel. On vessel’s return rig new entablature back across the Diesel Generator flat into position
Duration: 1 day each call
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |